Office building Airbus B22, Customer Service, Toulouse
Four bare shapes are set into a play of screens of glass and metal, emblematic of the B22 building. These screens provide acoustic protection and sunshading, while embodying the search for the High Quality Environmental Standard (HQE) that marks this project. Structured around an atrium filled with trees, these units are characterized by simple, pure lines. Placed slightly out of line with one another, they are smoothly connected for efficient movement.
[ + ] detail
[ – ] detail
Program
Office building with an environmental quality approach.
Client
Airbus SAS
Project team
Chaix & Morel et Associés, Paris
Philippe Chaix, Jean-Paul Morel, Rémy van Nieuwenhove, Denis Germond
with Frédéric Carrasco
and Itamar Krauss, René Lensch, Gary Masaero, Stéphane Monfrot, Bartlomiej Nawrocki, Julie Ovide, Anthony Pascual, Jose miguel Pomares, Aurélie de Seze, Aleksandra Sobol, Antoine Viger-Kohler
Khorsi Ordonneaud, worksite architect
Beterem, engineering company, quantity surveyor
AR&C, façade
Tribu, sustainable development consultants
Peutz & Associés, acoustical engineers
Julie Poirel, landscape designers
Key figures
Area : 24 000 m² SHON
Construction costs excl. VAT : 25,1 M €
Competition 2003 - completion 2005
Photography credits
Hervé Abbadie
[ – ] detail