Stands of the sports complexe La Couldre, Montigny-le-Bretonneux
The sports stand is situated on a rectangular lot between two athletic fields. Its base is concrete, massive and mineral, contrasting with the lightness of the polycarbonate cover. The simple volume, based on repetitive elements, is an economic solution. Open to both sides, the stands offer a panoramic view of the site : the adjoining premises located in the base give onto a wood terrace, extending beyond the bleachers.
[ + ] detail
[ – ] detail
Program
Public stands and cloakrooms of the sport complex.
Client
SAN St Quentin en Yvelines
EPA St Quentin en Yvelines, client representative
Project team
Chaix & Morel et Associés, Paris
Philippe Chaix, Jean-Paul Morel, Rémy van Nieuwenhove, Walter Grasmug
and Kaï Jorge Jensen, Dorothée Nourisson, Emmanuel Laurent
Ingerop, engineering, coordination
AR&C, structure
Inex, mechanical engineering
Key figures
1 000 seats
Area : 991 m² SHON
Construction costs excl. VAT : 2,4 M €
Competition 1996 - completion 1999
Photography credits
Chaix & Morel et Associés
[ – ] detail