Program
20 000 seats covered stadium for football and rugby (demolition of the old stadium).
Locker-rooms, administration, media annex, etc.
Client
Communauté d’agglomération Grenoble Alpes Métropole
Territoires 38, client representative
Project team
Chaix & Morel et Associés, Paris
Philippe Chaix, Jean-Paul Morel, Walter Grasmug
with Caroline Djuric, Brunehilde Ezanno, Kaï Jensen
and Frédéric Carrasco, Shamima Dhoomum, Anna Goldanowska, Clément Josse, Aurélie Joubaire, Aurélia Leclerc, Woojin Lim, Gary Masaero, Stéphane Monfort, Pepe Pomares, Sophie Poussange, Stéphane Ricout, Thomas Royer, Aurélie de Seze, Mattheus Zurowski
Ingérop Vienne, engineering, coordination
AR&C, metallic structures and façades
Peutz, acoustics
Aartill, lighting
Technicité, lawn specialist
Tribu, sustainable development
PSP Technologien GmbH, wind-tunnel tests, thermal studies
Margaret Gray, signage
Key figures
20 000 seats
Area : 13 200 m² SHON
Construction costs excl. VAT : 44,2 M €
Competition 2002 - completion 2008
Environmental specifications
Environmental quality approach applied.
Companies
Demathieu & Bard, structure ; Cabrol, glass roof, façades and cladding ; Iovini, external woodwork ; Valenti, walls doubling plastering work ; Savignon, interior woodwork, furniture ; Ciolfi, glued flooring and walls ; Lambda Isolation, false ceilings ; Prezioso, paint ; Somer, locksmith ; Signet, signage ; Ratto Perenon, sanitation ; Axima, climate engineering ; ETDE-INEO, HV electricity ; 2H Energy, generator ; Sobeca, lawn lighting, bleachers and general public circulations ; Bertele, scoreboard, seats ; SNEF, LV electricity ; Cegelec, detection and fire alarm ; Audio Techniques, PA system ; Thyssen Krupp, elevators ; Parcs & Sports, lawn.
Awards and distinctions
Nomination at the Équerre d'Argent Prize 2008
Photography credits
Hervé Abbadie
Pierre Jayet
Christian Richters
PHOTEC
[ – ] detail